Things to note when installing integrated sewage treatment equipment
Nowadays, the problem of water pollution has gradually attracted people's attention. Industrial water consumption is relatively large, and it is often discharged directly into rivers without treatment or allowed to flow across the river. Therefore, integrated sewage treatment equipment has become popular and integrated sewage treatment equipment is used. It is convenient and safe, but we still need to pay special attention to the following issues during installation.
1. The site address must be surveyed before design.Because urban geographical environments vary widely, the layout of some sewage collection network pipes is often adapted to local conditions. Therefore, it is very important to conduct site selection and on-site investigation of sewage treatment sites before designing structures matching the equipment.
2. Selection of lifting pumps for sewage equipmentSome impurities and dirt in the sewage (such as small rags, lines, hair) easily pass through the grille but are easy to accumulate at the water pump impeller until they completely block the water pump. Therefore, when choosing a water pump, you need to choose a water pump that is not easily blocked and also Consider a corresponding corrosion-resistant water pump.
3. Setting and selection of various pipeline accessoriesIt is necessary to pay attention to the type and model of the solenoid valve, especially the sealing performance of the solenoid valve. According to the specific conditions of different water stations, check valves should be installed at appropriate locations in the water pipeline.
4. Select equipment for the size of the equipment roomWhen determining the size of the equipment room, the size and spacing of each equipment in the equipment room and the direction of the pipelines in the equipment room should be fully considered. At the same time, the convenience of maintenance, disassembly and assembly of the equipment in the equipment room should be taken into consideration.
5. Design of automation programIntegrated small sewage treatment equipment is required to be unattended. However, cities often have power outages, so the automatic control procedures of the equipment are required. The equipment should be able to automatically return to normal operation when power is restored after a power outage. Industrial sewage concentration changes greatly, sewage volume changes greatly, and power outages occur frequently. Faced with such a harsh environment, it is necessary to have a process with strong adaptability and fast recovery.