Iraq EBS Oil Project

  • Home
  • Wastewater Treatment Project

Iraq EBS Oil Project

001-1.jpg

The project will be shipped and installed in mid April 2023 and put into operation in June. From the first party's proposal of requirements, scheme design, product design and production to acceptance, the customer has repeatedly praised and expressed satisfaction.

001-2.jpg

The explosion-proof fully automatic dosing device has a compact structure, precise measurement, high safety performance, and high degree of automation. Users only need to place the combined dosing device in the dosing room, connect the water inlet and outlet, and connect the power supply to start and put it into operation. This factory mounted device can greatly reduce the workload of on-site construction. The customer is very satisfied with the performance of our equipment,The equipment operates stably, with reliable quality. We are very grateful for the trust and praise of the other party.